2020

Reconstruction of the swimming pool building of Jūrmala Sports School

In summer 2019, the Jūrmala City Council signed an agreement with the partnership AKN for the reconstruction and energy efficiency upgrade of the swimming pool building of Jūrmala Sports School. In the project, low voltage and power supply network installation was entrusted to SIA Moduls Engineering.

All old and worn out installations and devices of the entire low voltage network, i.e. fire detection and alarm systems, access control and security alarms, data networks, video surveillance and central address system, were dismantled and replaced with modern materials and equipment. The audio system was enhanced to ensure that during competitions the information about the events can be heard in every room. A WC call system was installed for people with functional disorders.

Same as the low voltage systems, the old electrical networks were removed and a new system was installed, including replacement of all lighting fixtures with energy efficient LED luminaires. All work was performed in time and with due quality.


Project:

Reconstruction and energy efficiency upgrade of the swimming pool building of Jūrmala Sports School

Address:

Rūpniecības 13, k-4, Jūrmala

Customer:

Jūrmala City Council

General contractor:

SIA NEGOCIO

Construction period:

September 2019 – July 2020

Work performed in the project:

2230 m2