2018

RECONSTRUCTION OF AN ADMINISTRATIVE BUILDING

In the project, Moduls Engineering will perform full dismantling of the existing interior power supply system at Tukums Court administrative building and installation of new low-voltage and power supply networks. A modern fire detection and alarm system will be installed in the building along with a central public address system and a video surveillance system. Power supply networks, a security and access control system and a powerful telephone and computer network will be built from scratch.


Project:

RECONSTRUCTION OF AN ADMINISTRATIVE BUILDING

Address:

Pils 16, Tukums

Customer:

VAS TIESU NAMA AĢENTŪRA

General contractor:

SIA „VELVE”

Construction period:

January-June 2018

Total project area:

1500 m2