2021
Random simplified restoration works in the building of Riga Hanza Secondary School
Moduls Engineering will perform the following works within the framework of the project of random simplified restoration works in the building of Riga Hanza Secondary School:
- General construction works including replacement of the 1st, 2nd and 3rd floor and staircase finish materials with more contemporary solutions
- Building of water supply and sewerage systems
- Building of heating and toilet facilities ventilation systems
- Building of internal power supply networks
- Installation of automatic fire detection and alarm systems
Assembly of data network