2021
Supply and building of ventilation systems in Ādaži Secondary School
Within the framework of the project of building of ventilation systems in Ādaži Secondary School, Buildings A and B, Moduls Engineering will perform the following works:
- Supply and storage of modern ventilation equipment with air exchange conforming to the standard LVS CR 1752:2008 on the basis of the designing task;
- Assembly of ventilation systems and installation, connection, testing and adjustment of equipment.