Rebuilding of the 2nd floor of the building of Jūrmala Hospital

Moduls Engineering will perform the following works within the framework of the project:

  • Dismantling of individual parts of non-structural brick masonry partitions and construction of new partitions, expansion of door apertures at separate locations in the longitudinal structural brick walls to design the Endoscopy Unit with out-patient area, separate physicians’ offices, Surgery Unit with wards and Therapy Unit with wards;
  • Interior decoration of all the premises using modern and certified materials, and choosing the type of decoration according to the functions of the premises;
  • Building of a new ventilation system;
  • Rebuilding or replacement of the air conditioning system;
  • Rebuilding or replacement of the waterpipe and sewerage system;
  • Rebuilding and replacement of the heat supply system;
  • Full replacement of the power supply system, including the installation of new power and lighting networks;
  • Rebuilding and replacement of the electronic communication system, including computer network, video surveillance, TV network, voice fire alarm address system network;
  • Installation of nurse calling system;
  • Building of medical gas system line, building of medical consoles in the wards and recovery room;
  • Building of nurse and administrator posts;
  • Installation of steel inner doors and fire-proof inner doors;
  • Installation of wooden windowsills.

Site name:

Rebuilding of the 2nd floor of the building of Jūrmala Hospital

Address:

Vienības prospekts 19/21, Jūrmala

Client:

LLC (SIA) “Jūrmalas slimnīca”

Main contractor:

SIA Moduls Engineering

Construction period:

October 2021 – March 2022

Total area of the site:

Area of the premises to be renewed 1,020.1m2